video corpo
Add to favorites

#Industry News

PRODUCTION - ISOLATOR

New project in progress at the assembly ! An isolator for sterile application is currently being assembled at the EREA workshop.

This isolator is made up of four main components:

- A control box (HMI),

- An entry SAS (single-sided, without gloves),

- A storage chamber for desiccation and tyvek removal,

- A filling and capping chamber.

The equipment will incorporate a bio-decontamination system, robots and glove testers.

Next step: this equipment will be at positive pressure, and our teams will integrate soon a filling and capping machine. That isolator is designed to fill and cap syringes, in compliance with technical specifications.

PRODUCTION - ISOLATOR

Details

  • Rte de Barleux, 80200 Péronne, France
  • EREA

    Products associated